Service · Auckland

Bathroom renovations in Auckland, done in the right order

Bathrooms fail at the parts you can't see. We manage the waterproofing, plumbing and ventilation as carefully as the tiles you chose.

A bathroom is a small room with a lot of risk packed into it. Water gets behind tiles, extraction fans vent into the ceiling, and a shower tray set at the wrong fall leaves a puddle for the next twenty years. These problems usually start with a rushed sequence.

Refiner schedules each trade so the work underneath is checked before it's covered. The membrane is applied by a certified installer and photographed before tiling. Plumbing is pressure-tested before linings go on. You get the records at the end.

What's included

  • Site visit, measure and review of the existing plumbing and ventilation
  • Fixture and finish selections, with help choosing tiles, vanities and tapware
  • Itemised pricing from licensed trades, with our fee shown separately
  • Consent check, and lodging with Auckland Council where needed
  • Certified waterproofing membrane, photographed before tiling
  • Registered plumber and electrician, with compliance certificates
  • Ventilation ducted to the outside, not into the roof space
  • Handover file with every certificate, warranty and photo

Typical timeline

Every job is different, but these are realistic ranges for Auckland homes.

StageDurationWhat happens
Brief and scope1–2 weeksSite visit, measure, written scope
Selections and pricing2–3 weeksFixtures, tiles, trade prices
Strip-out and services1 weekDemolition, plumbing and electrical rough-in
Linings and waterproofing1–1.5 weeksWall linings, membrane, curing time
Tiling and fit-off1–2 weeksTiling, fixtures, paint, final checks

What it costs

Cost depends on size, layout changes and finishes. Our Auckland renovation cost guide sets out typical ranges and what pushes a job up or down. After a site visit, you get a written scope with real trade prices.

Questions

How long does a bathroom renovation take?

Most bathrooms take 3 to 5 weeks on site, plus a few weeks beforehand for design, pricing and ordering. Curing time for waterproofing and tiling is built into the schedule, not rushed.

Do I need consent to renovate a bathroom?

Replacing fixtures in the same positions often doesn't need consent. Adding a bathroom, moving the toilet or making structural changes usually does. We check your plans against the rules and apply where needed.

Who does the waterproofing?

A certified applicator for the membrane system being used, so the warranty stands. We photograph the membrane before it's tiled over and keep the records for you.

What paperwork do I get at the end?

Plumbing and electrical certificates, waterproofing records, product warranties and, for consented work, the Code Compliance Certificate. It all goes into one handover file.

Start with a site visit

We come to you, walk the space, and talk through what you want to change. You get a written scope and budget range before you commit to anything.

Book a site visit